Manufacturing base · Foshan, Guangdong
Inside Our Factory
Sheet-metal forming and welding happen on one site in Foshan, Guangdong. Sales and export documentation run from Shanghai. Nothing is subcontracted except powder coating and injection moulding, which are handled by two partner plants within 30 km.
4,000 m²
Plant area
8
Production lines
31
Machines on site
Since 2014
Manufacturing in Foshan
Layout
Two workshops, one site
- 01Workshop 1Stamping, cutting, sheet-metal forming, tube bending and punching. The heavy plant sits here, so tube and sheet travel the shortest distance between operations.
- 02Workshop 2Welding, machine maintenance and the power room. Welding is separated from coating and assembly to keep sparks away from finished surfaces.
- 03Storage and loadingFinished goods and the loading bay. Containers are loaded on site, and every loading is photographed.

Equipment
Machine list
The plant is built around tube bending and sheet-metal work, because that is what a platform trolley actually is: a bent tube frame, a formed deck and a welded joint.
| Tube bending | 3-axis CNC servo tube bender (DW-50CNC) |
| Welding | 8 welding sets, 6 of them MIG |
| Pressing | 100 T press |
| Bending | 40 T press brake |
| Shearing | Guillotine shear |
| Punching | Punch and corner-notching machine (BJ-100) |
| Outsourced | Powder coating and injection moulding, partner plants within 30 km |
Machine count excludes hand tools, welding positioners and the packing line.
Operations
Six operations, in order
01
Cut and blank
Tube cut to length, sheet blanked to deck size. Offcut goes back to stock by gauge.
02
Form
Tube bent on the CNC bender, deck pressed or folded, ribs formed.
03
Punch and notch
Mounting holes, caster plates and handle sockets punched in one set-up.
04
Weld
MIG welding on jigs. Weld seams ground by hand where a hand passes.
05
Coat and assemble
Powder coating at the partner plant, then casters, handle and hardware fitted here.
06
Pack and load
Carton or knock-down packing, loading plan, photographs before the container is sealed.
Quality
Three inspection points
01
Incoming material
Tube wall thickness and sheet gauge checked against the drawing on receipt. Steel grade certificate kept with the batch.
02
In-process weld check
Every tenth frame is checked for weld penetration at the handle socket and the caster plate — the two joints that fail first.
03
Pre-shipment
Load test at rated static load, caster function, folding action and finish inspection. Photographs go to the buyer before loading.
Logistics
Ports and terms
We do not book freight. You nominate the forwarder and we deliver to their warehouse in China — which keeps you in control of the rate and the routing.
- FOBShanghai / Shenzhen / GuangzhouNominated by the buyer. Loading photographs and packing list go out before the container leaves.
- MOQ2 pcs in stock · 5 pcs customTrial orders do not need a container.
- Payment100% T/T in advanceProduction is scheduled on receipt.

Come and see it, or ask for a video walk-through
We are in Foshan, Guangdong. Send the dates and we will arrange the visit, or shoot the line you want to check.